2014-01-27 19:20:15 +08:00
|
|
|
|
Deadline Task Scheduling
|
|
|
|
|
------------------------
|
|
|
|
|
|
|
|
|
|
CONTENTS
|
|
|
|
|
========
|
|
|
|
|
|
|
|
|
|
0. WARNING
|
|
|
|
|
1. Overview
|
|
|
|
|
2. Scheduling algorithm
|
|
|
|
|
3. Scheduling Real-Time Tasks
|
|
|
|
|
4. Bandwidth management
|
|
|
|
|
4.1 System-wide settings
|
|
|
|
|
4.2 Task interface
|
|
|
|
|
4.3 Default behavior
|
|
|
|
|
5. Tasks CPU affinity
|
|
|
|
|
5.1 SCHED_DEADLINE and cpusets HOWTO
|
|
|
|
|
6. Future plans
|
2014-09-09 17:57:15 +08:00
|
|
|
|
A. Test suite
|
2014-09-09 17:57:16 +08:00
|
|
|
|
B. Minimal main()
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0. WARNING
|
|
|
|
|
==========
|
|
|
|
|
|
|
|
|
|
Fiddling with these settings can result in an unpredictable or even unstable
|
|
|
|
|
system behavior. As for -rt (group) scheduling, it is assumed that root users
|
|
|
|
|
know what they're doing.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. Overview
|
|
|
|
|
===========
|
|
|
|
|
|
|
|
|
|
The SCHED_DEADLINE policy contained inside the sched_dl scheduling class is
|
|
|
|
|
basically an implementation of the Earliest Deadline First (EDF) scheduling
|
|
|
|
|
algorithm, augmented with a mechanism (called Constant Bandwidth Server, CBS)
|
|
|
|
|
that makes it possible to isolate the behavior of tasks between each other.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. Scheduling algorithm
|
|
|
|
|
==================
|
|
|
|
|
|
|
|
|
|
SCHED_DEADLINE uses three parameters, named "runtime", "period", and
|
2014-09-09 17:57:14 +08:00
|
|
|
|
"deadline", to schedule tasks. A SCHED_DEADLINE task should receive
|
2014-01-27 19:20:15 +08:00
|
|
|
|
"runtime" microseconds of execution time every "period" microseconds, and
|
|
|
|
|
these "runtime" microseconds are available within "deadline" microseconds
|
2015-05-18 21:00:25 +08:00
|
|
|
|
from the beginning of the period. In order to implement this behavior,
|
2014-01-27 19:20:15 +08:00
|
|
|
|
every time the task wakes up, the scheduler computes a "scheduling deadline"
|
|
|
|
|
consistent with the guarantee (using the CBS[2,3] algorithm). Tasks are then
|
|
|
|
|
scheduled using EDF[1] on these scheduling deadlines (the task with the
|
2014-09-09 17:57:14 +08:00
|
|
|
|
earliest scheduling deadline is selected for execution). Notice that the
|
|
|
|
|
task actually receives "runtime" time units within "deadline" if a proper
|
|
|
|
|
"admission control" strategy (see Section "4. Bandwidth management") is used
|
|
|
|
|
(clearly, if the system is overloaded this guarantee cannot be respected).
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
2015-05-18 21:00:26 +08:00
|
|
|
|
Summing up, the CBS[2,3] algorithm assigns scheduling deadlines to tasks so
|
2014-01-27 19:20:15 +08:00
|
|
|
|
that each task runs for at most its runtime every period, avoiding any
|
|
|
|
|
interference between different tasks (bandwidth isolation), while the EDF[1]
|
2014-09-09 17:57:12 +08:00
|
|
|
|
algorithm selects the task with the earliest scheduling deadline as the one
|
|
|
|
|
to be executed next. Thanks to this feature, tasks that do not strictly comply
|
|
|
|
|
with the "traditional" real-time task model (see Section 3) can effectively
|
|
|
|
|
use the new policy.
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
In more details, the CBS algorithm assigns scheduling deadlines to
|
|
|
|
|
tasks in the following way:
|
|
|
|
|
|
2015-05-18 21:00:25 +08:00
|
|
|
|
- Each SCHED_DEADLINE task is characterized by the "runtime",
|
2014-01-27 19:20:15 +08:00
|
|
|
|
"deadline", and "period" parameters;
|
|
|
|
|
|
|
|
|
|
- The state of the task is described by a "scheduling deadline", and
|
2014-09-09 17:57:12 +08:00
|
|
|
|
a "remaining runtime". These two parameters are initially set to 0;
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
- When a SCHED_DEADLINE task wakes up (becomes ready for execution),
|
|
|
|
|
the scheduler checks if
|
|
|
|
|
|
2014-09-09 17:57:12 +08:00
|
|
|
|
remaining runtime runtime
|
|
|
|
|
---------------------------------- > ---------
|
|
|
|
|
scheduling deadline - current time period
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
then, if the scheduling deadline is smaller than the current time, or
|
|
|
|
|
this condition is verified, the scheduling deadline and the
|
2015-05-18 21:00:25 +08:00
|
|
|
|
remaining runtime are re-initialized as
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
scheduling deadline = current time + deadline
|
2014-09-09 17:57:12 +08:00
|
|
|
|
remaining runtime = runtime
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
2014-09-09 17:57:12 +08:00
|
|
|
|
otherwise, the scheduling deadline and the remaining runtime are
|
2014-01-27 19:20:15 +08:00
|
|
|
|
left unchanged;
|
|
|
|
|
|
|
|
|
|
- When a SCHED_DEADLINE task executes for an amount of time t, its
|
2014-09-09 17:57:12 +08:00
|
|
|
|
remaining runtime is decreased as
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
2014-09-09 17:57:12 +08:00
|
|
|
|
remaining runtime = remaining runtime - t
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
(technically, the runtime is decreased at every tick, or when the
|
|
|
|
|
task is descheduled / preempted);
|
|
|
|
|
|
2014-09-09 17:57:12 +08:00
|
|
|
|
- When the remaining runtime becomes less or equal than 0, the task is
|
2014-01-27 19:20:15 +08:00
|
|
|
|
said to be "throttled" (also known as "depleted" in real-time literature)
|
|
|
|
|
and cannot be scheduled until its scheduling deadline. The "replenishment
|
|
|
|
|
time" for this task (see next item) is set to be equal to the current
|
|
|
|
|
value of the scheduling deadline;
|
|
|
|
|
|
|
|
|
|
- When the current time is equal to the replenishment time of a
|
2014-09-09 17:57:12 +08:00
|
|
|
|
throttled task, the scheduling deadline and the remaining runtime are
|
2014-01-27 19:20:15 +08:00
|
|
|
|
updated as
|
|
|
|
|
|
|
|
|
|
scheduling deadline = scheduling deadline + period
|
2014-09-09 17:57:12 +08:00
|
|
|
|
remaining runtime = remaining runtime + runtime
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. Scheduling Real-Time Tasks
|
|
|
|
|
=============================
|
|
|
|
|
|
|
|
|
|
* BIG FAT WARNING ******************************************************
|
|
|
|
|
*
|
|
|
|
|
* This section contains a (not-thorough) summary on classical deadline
|
|
|
|
|
* scheduling theory, and how it applies to SCHED_DEADLINE.
|
|
|
|
|
* The reader can "safely" skip to Section 4 if only interested in seeing
|
|
|
|
|
* how the scheduling policy can be used. Anyway, we strongly recommend
|
|
|
|
|
* to come back here and continue reading (once the urge for testing is
|
|
|
|
|
* satisfied :P) to be sure of fully understanding all technical details.
|
|
|
|
|
************************************************************************
|
|
|
|
|
|
|
|
|
|
There are no limitations on what kind of task can exploit this new
|
|
|
|
|
scheduling discipline, even if it must be said that it is particularly
|
|
|
|
|
suited for periodic or sporadic real-time tasks that need guarantees on their
|
|
|
|
|
timing behavior, e.g., multimedia, streaming, control applications, etc.
|
|
|
|
|
|
|
|
|
|
A typical real-time task is composed of a repetition of computation phases
|
|
|
|
|
(task instances, or jobs) which are activated on a periodic or sporadic
|
|
|
|
|
fashion.
|
2015-05-18 21:00:25 +08:00
|
|
|
|
Each job J_j (where J_j is the j^th job of the task) is characterized by an
|
2014-01-27 19:20:15 +08:00
|
|
|
|
arrival time r_j (the time when the job starts), an amount of computation
|
|
|
|
|
time c_j needed to finish the job, and a job absolute deadline d_j, which
|
|
|
|
|
is the time within which the job should be finished. The maximum execution
|
2015-05-18 21:00:28 +08:00
|
|
|
|
time max{c_j} is called "Worst Case Execution Time" (WCET) for the task.
|
2014-01-27 19:20:15 +08:00
|
|
|
|
A real-time task can be periodic with period P if r_{j+1} = r_j + P, or
|
|
|
|
|
sporadic with minimum inter-arrival time P is r_{j+1} >= r_j + P. Finally,
|
|
|
|
|
d_j = r_j + D, where D is the task's relative deadline.
|
2015-05-18 21:00:25 +08:00
|
|
|
|
The utilization of a real-time task is defined as the ratio between its
|
2014-09-09 17:57:14 +08:00
|
|
|
|
WCET and its period (or minimum inter-arrival time), and represents
|
|
|
|
|
the fraction of CPU time needed to execute the task.
|
|
|
|
|
|
2015-05-18 21:00:28 +08:00
|
|
|
|
If the total utilization U=sum(WCET_i/P_i) is larger than M (with M equal
|
2014-09-09 17:57:14 +08:00
|
|
|
|
to the number of CPUs), then the scheduler is unable to respect all the
|
|
|
|
|
deadlines.
|
2015-05-18 21:00:25 +08:00
|
|
|
|
Note that total utilization is defined as the sum of the utilizations
|
2014-09-09 17:57:14 +08:00
|
|
|
|
WCET_i/P_i over all the real-time tasks in the system. When considering
|
|
|
|
|
multiple real-time tasks, the parameters of the i-th task are indicated
|
|
|
|
|
with the "_i" suffix.
|
2015-05-18 21:00:25 +08:00
|
|
|
|
Moreover, if the total utilization is larger than M, then we risk starving
|
2014-09-09 17:57:14 +08:00
|
|
|
|
non- real-time tasks by real-time tasks.
|
2015-05-18 21:00:25 +08:00
|
|
|
|
If, instead, the total utilization is smaller than M, then non real-time
|
2014-09-09 17:57:14 +08:00
|
|
|
|
tasks will not be starved and the system might be able to respect all the
|
|
|
|
|
deadlines.
|
|
|
|
|
As a matter of fact, in this case it is possible to provide an upper bound
|
|
|
|
|
for tardiness (defined as the maximum between 0 and the difference
|
|
|
|
|
between the finishing time of a job and its absolute deadline).
|
|
|
|
|
More precisely, it can be proven that using a global EDF scheduler the
|
|
|
|
|
maximum tardiness of each task is smaller or equal than
|
|
|
|
|
((M − 1) · WCET_max − WCET_min)/(M − (M − 2) · U_max) + WCET_max
|
2015-05-18 21:00:28 +08:00
|
|
|
|
where WCET_max = max{WCET_i} is the maximum WCET, WCET_min=min{WCET_i}
|
|
|
|
|
is the minimum WCET, and U_max = max{WCET_i/P_i} is the maximum utilization.
|
2014-09-09 17:57:14 +08:00
|
|
|
|
|
|
|
|
|
If M=1 (uniprocessor system), or in case of partitioned scheduling (each
|
|
|
|
|
real-time task is statically assigned to one and only one CPU), it is
|
|
|
|
|
possible to formally check if all the deadlines are respected.
|
|
|
|
|
If D_i = P_i for all tasks, then EDF is able to respect all the deadlines
|
2015-05-18 21:00:25 +08:00
|
|
|
|
of all the tasks executing on a CPU if and only if the total utilization
|
2014-09-09 17:57:14 +08:00
|
|
|
|
of the tasks running on such a CPU is smaller or equal than 1.
|
|
|
|
|
If D_i != P_i for some task, then it is possible to define the density of
|
2015-05-18 21:00:27 +08:00
|
|
|
|
a task as WCET_i/min{D_i,P_i}, and EDF is able to respect all the deadlines
|
2015-05-18 21:00:28 +08:00
|
|
|
|
of all the tasks running on a CPU if the sum sum(WCET_i/min{D_i,P_i}) of the
|
2014-09-09 17:57:14 +08:00
|
|
|
|
densities of the tasks running on such a CPU is smaller or equal than 1
|
|
|
|
|
(notice that this condition is only sufficient, and not necessary).
|
|
|
|
|
|
|
|
|
|
On multiprocessor systems with global EDF scheduling (non partitioned
|
|
|
|
|
systems), a sufficient test for schedulability can not be based on the
|
2015-05-18 21:00:25 +08:00
|
|
|
|
utilizations (it can be shown that task sets with utilizations slightly
|
2014-09-09 17:57:14 +08:00
|
|
|
|
larger than 1 can miss deadlines regardless of the number of CPUs M).
|
2015-05-18 21:00:25 +08:00
|
|
|
|
However, as previously stated, enforcing that the total utilization is smaller
|
2014-09-09 17:57:14 +08:00
|
|
|
|
than M is enough to guarantee that non real-time tasks are not starved and
|
|
|
|
|
that the tardiness of real-time tasks has an upper bound.
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
SCHED_DEADLINE can be used to schedule real-time tasks guaranteeing that
|
|
|
|
|
the jobs' deadlines of a task are respected. In order to do this, a task
|
|
|
|
|
must be scheduled by setting:
|
|
|
|
|
|
|
|
|
|
- runtime >= WCET
|
|
|
|
|
- deadline = D
|
|
|
|
|
- period <= P
|
|
|
|
|
|
2015-05-18 21:00:26 +08:00
|
|
|
|
IOW, if runtime >= WCET and if period is <= P, then the scheduling deadlines
|
2014-01-27 19:20:15 +08:00
|
|
|
|
and the absolute deadlines (d_j) coincide, so a proper admission control
|
|
|
|
|
allows to respect the jobs' absolute deadlines for this task (this is what is
|
|
|
|
|
called "hard schedulability property" and is an extension of Lemma 1 of [2]).
|
2014-09-09 17:57:12 +08:00
|
|
|
|
Notice that if runtime > deadline the admission control will surely reject
|
|
|
|
|
this task, as it is not possible to respect its temporal constraints.
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
References:
|
|
|
|
|
1 - C. L. Liu and J. W. Layland. Scheduling algorithms for multiprogram-
|
|
|
|
|
ming in a hard-real-time environment. Journal of the Association for
|
|
|
|
|
Computing Machinery, 20(1), 1973.
|
|
|
|
|
2 - L. Abeni , G. Buttazzo. Integrating Multimedia Applications in Hard
|
|
|
|
|
Real-Time Systems. Proceedings of the 19th IEEE Real-time Systems
|
|
|
|
|
Symposium, 1998. http://retis.sssup.it/~giorgio/paps/1998/rtss98-cbs.pdf
|
|
|
|
|
3 - L. Abeni. Server Mechanisms for Multimedia Applications. ReTiS Lab
|
2014-09-09 17:57:12 +08:00
|
|
|
|
Technical Report. http://disi.unitn.it/~abeni/tr-98-01.pdf
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
4. Bandwidth management
|
|
|
|
|
=======================
|
|
|
|
|
|
2014-09-09 17:57:14 +08:00
|
|
|
|
As previously mentioned, in order for -deadline scheduling to be
|
|
|
|
|
effective and useful (that is, to be able to provide "runtime" time units
|
|
|
|
|
within "deadline"), it is important to have some method to keep the allocation
|
|
|
|
|
of the available fractions of CPU time to the various tasks under control.
|
|
|
|
|
This is usually called "admission control" and if it is not performed, then
|
|
|
|
|
no guarantee can be given on the actual scheduling of the -deadline tasks.
|
|
|
|
|
|
|
|
|
|
As already stated in Section 3, a necessary condition to be respected to
|
2015-05-18 21:00:25 +08:00
|
|
|
|
correctly schedule a set of real-time tasks is that the total utilization
|
2014-09-09 17:57:14 +08:00
|
|
|
|
is smaller than M. When talking about -deadline tasks, this requires that
|
|
|
|
|
the sum of the ratio between runtime and period for all tasks is smaller
|
2015-05-18 21:00:25 +08:00
|
|
|
|
than M. Notice that the ratio runtime/period is equivalent to the utilization
|
2014-09-09 17:57:14 +08:00
|
|
|
|
of a "traditional" real-time task, and is also often referred to as
|
|
|
|
|
"bandwidth".
|
|
|
|
|
The interface used to control the CPU bandwidth that can be allocated
|
|
|
|
|
to -deadline tasks is similar to the one already used for -rt
|
2014-09-09 17:57:13 +08:00
|
|
|
|
tasks with real-time group scheduling (a.k.a. RT-throttling - see
|
|
|
|
|
Documentation/scheduler/sched-rt-group.txt), and is based on readable/
|
|
|
|
|
writable control files located in procfs (for system wide settings).
|
|
|
|
|
Notice that per-group settings (controlled through cgroupfs) are still not
|
|
|
|
|
defined for -deadline tasks, because more discussion is needed in order to
|
|
|
|
|
figure out how we want to manage SCHED_DEADLINE bandwidth at the task group
|
|
|
|
|
level.
|
|
|
|
|
|
|
|
|
|
A main difference between deadline bandwidth management and RT-throttling
|
2014-01-27 19:20:15 +08:00
|
|
|
|
is that -deadline tasks have bandwidth on their own (while -rt ones don't!),
|
2014-09-09 17:57:13 +08:00
|
|
|
|
and thus we don't need a higher level throttling mechanism to enforce the
|
2014-09-09 17:57:14 +08:00
|
|
|
|
desired bandwidth. In other words, this means that interface parameters are
|
|
|
|
|
only used at admission control time (i.e., when the user calls
|
|
|
|
|
sched_setattr()). Scheduling is then performed considering actual tasks'
|
|
|
|
|
parameters, so that CPU bandwidth is allocated to SCHED_DEADLINE tasks
|
|
|
|
|
respecting their needs in terms of granularity. Therefore, using this simple
|
|
|
|
|
interface we can put a cap on total utilization of -deadline tasks (i.e.,
|
|
|
|
|
\Sum (runtime_i / period_i) < global_dl_utilization_cap).
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
4.1 System wide settings
|
|
|
|
|
------------------------
|
|
|
|
|
|
|
|
|
|
The system wide settings are configured under the /proc virtual file system.
|
|
|
|
|
|
2014-09-09 17:57:13 +08:00
|
|
|
|
For now the -rt knobs are used for -deadline admission control and the
|
2015-05-18 21:00:25 +08:00
|
|
|
|
-deadline runtime is accounted against the -rt runtime. We realize that this
|
2014-09-09 17:57:13 +08:00
|
|
|
|
isn't entirely desirable; however, it is better to have a small interface for
|
|
|
|
|
now, and be able to change it easily later. The ideal situation (see 5.) is to
|
|
|
|
|
run -rt tasks from a -deadline server; in which case the -rt bandwidth is a
|
|
|
|
|
direct subset of dl_bw.
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
This means that, for a root_domain comprising M CPUs, -deadline tasks
|
|
|
|
|
can be created while the sum of their bandwidths stays below:
|
|
|
|
|
|
|
|
|
|
M * (sched_rt_runtime_us / sched_rt_period_us)
|
|
|
|
|
|
|
|
|
|
It is also possible to disable this bandwidth management logic, and
|
|
|
|
|
be thus free of oversubscribing the system up to any arbitrary level.
|
|
|
|
|
This is done by writing -1 in /proc/sys/kernel/sched_rt_runtime_us.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4.2 Task interface
|
|
|
|
|
------------------
|
|
|
|
|
|
|
|
|
|
Specifying a periodic/sporadic task that executes for a given amount of
|
|
|
|
|
runtime at each instance, and that is scheduled according to the urgency of
|
|
|
|
|
its own timing constraints needs, in general, a way of declaring:
|
|
|
|
|
- a (maximum/typical) instance execution time,
|
|
|
|
|
- a minimum interval between consecutive instances,
|
|
|
|
|
- a time constraint by which each instance must be completed.
|
|
|
|
|
|
|
|
|
|
Therefore:
|
|
|
|
|
* a new struct sched_attr, containing all the necessary fields is
|
|
|
|
|
provided;
|
|
|
|
|
* the new scheduling related syscalls that manipulate it, i.e.,
|
|
|
|
|
sched_setattr() and sched_getattr() are implemented.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4.3 Default behavior
|
|
|
|
|
---------------------
|
|
|
|
|
|
|
|
|
|
The default value for SCHED_DEADLINE bandwidth is to have rt_runtime equal to
|
|
|
|
|
950000. With rt_period equal to 1000000, by default, it means that -deadline
|
|
|
|
|
tasks can use at most 95%, multiplied by the number of CPUs that compose the
|
|
|
|
|
root_domain, for each root_domain.
|
2014-09-09 17:57:14 +08:00
|
|
|
|
This means that non -deadline tasks will receive at least 5% of the CPU time,
|
|
|
|
|
and that -deadline tasks will receive their runtime with a guaranteed
|
|
|
|
|
worst-case delay respect to the "deadline" parameter. If "deadline" = "period"
|
|
|
|
|
and the cpuset mechanism is used to implement partitioned scheduling (see
|
|
|
|
|
Section 5), then this simple setting of the bandwidth management is able to
|
|
|
|
|
deterministically guarantee that -deadline tasks will receive their runtime
|
|
|
|
|
in a period.
|
|
|
|
|
|
|
|
|
|
Finally, notice that in order not to jeopardize the admission control a
|
|
|
|
|
-deadline task cannot fork.
|
2014-01-27 19:20:15 +08:00
|
|
|
|
|
|
|
|
|
5. Tasks CPU affinity
|
|
|
|
|
=====================
|
|
|
|
|
|
|
|
|
|
-deadline tasks cannot have an affinity mask smaller that the entire
|
|
|
|
|
root_domain they are created on. However, affinities can be specified
|
|
|
|
|
through the cpuset facility (Documentation/cgroups/cpusets.txt).
|
|
|
|
|
|
|
|
|
|
5.1 SCHED_DEADLINE and cpusets HOWTO
|
|
|
|
|
------------------------------------
|
|
|
|
|
|
|
|
|
|
An example of a simple configuration (pin a -deadline task to CPU0)
|
|
|
|
|
follows (rt-app is used to create a -deadline task).
|
|
|
|
|
|
|
|
|
|
mkdir /dev/cpuset
|
|
|
|
|
mount -t cgroup -o cpuset cpuset /dev/cpuset
|
|
|
|
|
cd /dev/cpuset
|
|
|
|
|
mkdir cpu0
|
|
|
|
|
echo 0 > cpu0/cpuset.cpus
|
|
|
|
|
echo 0 > cpu0/cpuset.mems
|
|
|
|
|
echo 1 > cpuset.cpu_exclusive
|
|
|
|
|
echo 0 > cpuset.sched_load_balance
|
|
|
|
|
echo 1 > cpu0/cpuset.cpu_exclusive
|
|
|
|
|
echo 1 > cpu0/cpuset.mem_exclusive
|
|
|
|
|
echo $$ > cpu0/tasks
|
|
|
|
|
rt-app -t 100000:10000:d:0 -D5 (it is now actually superfluous to specify
|
|
|
|
|
task affinity)
|
|
|
|
|
|
|
|
|
|
6. Future plans
|
|
|
|
|
===============
|
|
|
|
|
|
|
|
|
|
Still missing:
|
|
|
|
|
|
|
|
|
|
- refinements to deadline inheritance, especially regarding the possibility
|
|
|
|
|
of retaining bandwidth isolation among non-interacting tasks. This is
|
|
|
|
|
being studied from both theoretical and practical points of view, and
|
|
|
|
|
hopefully we should be able to produce some demonstrative code soon;
|
|
|
|
|
- (c)group based bandwidth management, and maybe scheduling;
|
|
|
|
|
- access control for non-root users (and related security concerns to
|
|
|
|
|
address), which is the best way to allow unprivileged use of the mechanisms
|
|
|
|
|
and how to prevent non-root users "cheat" the system?
|
|
|
|
|
|
|
|
|
|
As already discussed, we are planning also to merge this work with the EDF
|
|
|
|
|
throttling patches [https://lkml.org/lkml/2010/2/23/239] but we still are in
|
|
|
|
|
the preliminary phases of the merge and we really seek feedback that would
|
|
|
|
|
help us decide on the direction it should take.
|
2014-09-09 17:57:15 +08:00
|
|
|
|
|
|
|
|
|
Appendix A. Test suite
|
|
|
|
|
======================
|
|
|
|
|
|
|
|
|
|
The SCHED_DEADLINE policy can be easily tested using two applications that
|
|
|
|
|
are part of a wider Linux Scheduler validation suite. The suite is
|
|
|
|
|
available as a GitHub repository: https://github.com/scheduler-tools.
|
|
|
|
|
|
|
|
|
|
The first testing application is called rt-app and can be used to
|
|
|
|
|
start multiple threads with specific parameters. rt-app supports
|
|
|
|
|
SCHED_{OTHER,FIFO,RR,DEADLINE} scheduling policies and their related
|
|
|
|
|
parameters (e.g., niceness, priority, runtime/deadline/period). rt-app
|
|
|
|
|
is a valuable tool, as it can be used to synthetically recreate certain
|
|
|
|
|
workloads (maybe mimicking real use-cases) and evaluate how the scheduler
|
|
|
|
|
behaves under such workloads. In this way, results are easily reproducible.
|
|
|
|
|
rt-app is available at: https://github.com/scheduler-tools/rt-app.
|
|
|
|
|
|
|
|
|
|
Thread parameters can be specified from the command line, with something like
|
|
|
|
|
this:
|
|
|
|
|
|
|
|
|
|
# rt-app -t 100000:10000:d -t 150000:20000:f:10 -D5
|
|
|
|
|
|
|
|
|
|
The above creates 2 threads. The first one, scheduled by SCHED_DEADLINE,
|
|
|
|
|
executes for 10ms every 100ms. The second one, scheduled at SCHED_FIFO
|
|
|
|
|
priority 10, executes for 20ms every 150ms. The test will run for a total
|
|
|
|
|
of 5 seconds.
|
|
|
|
|
|
|
|
|
|
More interestingly, configurations can be described with a json file that
|
|
|
|
|
can be passed as input to rt-app with something like this:
|
|
|
|
|
|
|
|
|
|
# rt-app my_config.json
|
|
|
|
|
|
|
|
|
|
The parameters that can be specified with the second method are a superset
|
|
|
|
|
of the command line options. Please refer to rt-app documentation for more
|
|
|
|
|
details (<rt-app-sources>/doc/*.json).
|
|
|
|
|
|
|
|
|
|
The second testing application is a modification of schedtool, called
|
|
|
|
|
schedtool-dl, which can be used to setup SCHED_DEADLINE parameters for a
|
|
|
|
|
certain pid/application. schedtool-dl is available at:
|
|
|
|
|
https://github.com/scheduler-tools/schedtool-dl.git.
|
|
|
|
|
|
|
|
|
|
The usage is straightforward:
|
|
|
|
|
|
|
|
|
|
# schedtool -E -t 10000000:100000000 -e ./my_cpuhog_app
|
|
|
|
|
|
|
|
|
|
With this, my_cpuhog_app is put to run inside a SCHED_DEADLINE reservation
|
|
|
|
|
of 10ms every 100ms (note that parameters are expressed in microseconds).
|
|
|
|
|
You can also use schedtool to create a reservation for an already running
|
|
|
|
|
application, given that you know its pid:
|
|
|
|
|
|
|
|
|
|
# schedtool -E -t 10000000:100000000 my_app_pid
|
2014-09-09 17:57:16 +08:00
|
|
|
|
|
|
|
|
|
Appendix B. Minimal main()
|
|
|
|
|
==========================
|
|
|
|
|
|
|
|
|
|
We provide in what follows a simple (ugly) self-contained code snippet
|
|
|
|
|
showing how SCHED_DEADLINE reservations can be created by a real-time
|
|
|
|
|
application developer.
|
|
|
|
|
|
|
|
|
|
#define _GNU_SOURCE
|
|
|
|
|
#include <unistd.h>
|
|
|
|
|
#include <stdio.h>
|
|
|
|
|
#include <stdlib.h>
|
|
|
|
|
#include <string.h>
|
|
|
|
|
#include <time.h>
|
|
|
|
|
#include <linux/unistd.h>
|
|
|
|
|
#include <linux/kernel.h>
|
|
|
|
|
#include <linux/types.h>
|
|
|
|
|
#include <sys/syscall.h>
|
|
|
|
|
#include <pthread.h>
|
|
|
|
|
|
|
|
|
|
#define gettid() syscall(__NR_gettid)
|
|
|
|
|
|
|
|
|
|
#define SCHED_DEADLINE 6
|
|
|
|
|
|
|
|
|
|
/* XXX use the proper syscall numbers */
|
|
|
|
|
#ifdef __x86_64__
|
|
|
|
|
#define __NR_sched_setattr 314
|
|
|
|
|
#define __NR_sched_getattr 315
|
|
|
|
|
#endif
|
|
|
|
|
|
|
|
|
|
#ifdef __i386__
|
|
|
|
|
#define __NR_sched_setattr 351
|
|
|
|
|
#define __NR_sched_getattr 352
|
|
|
|
|
#endif
|
|
|
|
|
|
|
|
|
|
#ifdef __arm__
|
|
|
|
|
#define __NR_sched_setattr 380
|
|
|
|
|
#define __NR_sched_getattr 381
|
|
|
|
|
#endif
|
|
|
|
|
|
|
|
|
|
static volatile int done;
|
|
|
|
|
|
|
|
|
|
struct sched_attr {
|
|
|
|
|
__u32 size;
|
|
|
|
|
|
|
|
|
|
__u32 sched_policy;
|
|
|
|
|
__u64 sched_flags;
|
|
|
|
|
|
|
|
|
|
/* SCHED_NORMAL, SCHED_BATCH */
|
|
|
|
|
__s32 sched_nice;
|
|
|
|
|
|
|
|
|
|
/* SCHED_FIFO, SCHED_RR */
|
|
|
|
|
__u32 sched_priority;
|
|
|
|
|
|
|
|
|
|
/* SCHED_DEADLINE (nsec) */
|
|
|
|
|
__u64 sched_runtime;
|
|
|
|
|
__u64 sched_deadline;
|
|
|
|
|
__u64 sched_period;
|
|
|
|
|
};
|
|
|
|
|
|
|
|
|
|
int sched_setattr(pid_t pid,
|
|
|
|
|
const struct sched_attr *attr,
|
|
|
|
|
unsigned int flags)
|
|
|
|
|
{
|
|
|
|
|
return syscall(__NR_sched_setattr, pid, attr, flags);
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
int sched_getattr(pid_t pid,
|
|
|
|
|
struct sched_attr *attr,
|
|
|
|
|
unsigned int size,
|
|
|
|
|
unsigned int flags)
|
|
|
|
|
{
|
|
|
|
|
return syscall(__NR_sched_getattr, pid, attr, size, flags);
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
void *run_deadline(void *data)
|
|
|
|
|
{
|
|
|
|
|
struct sched_attr attr;
|
|
|
|
|
int x = 0;
|
|
|
|
|
int ret;
|
|
|
|
|
unsigned int flags = 0;
|
|
|
|
|
|
|
|
|
|
printf("deadline thread started [%ld]\n", gettid());
|
|
|
|
|
|
|
|
|
|
attr.size = sizeof(attr);
|
|
|
|
|
attr.sched_flags = 0;
|
|
|
|
|
attr.sched_nice = 0;
|
|
|
|
|
attr.sched_priority = 0;
|
|
|
|
|
|
|
|
|
|
/* This creates a 10ms/30ms reservation */
|
|
|
|
|
attr.sched_policy = SCHED_DEADLINE;
|
|
|
|
|
attr.sched_runtime = 10 * 1000 * 1000;
|
|
|
|
|
attr.sched_period = attr.sched_deadline = 30 * 1000 * 1000;
|
|
|
|
|
|
|
|
|
|
ret = sched_setattr(0, &attr, flags);
|
|
|
|
|
if (ret < 0) {
|
|
|
|
|
done = 0;
|
|
|
|
|
perror("sched_setattr");
|
|
|
|
|
exit(-1);
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
while (!done) {
|
|
|
|
|
x++;
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
printf("deadline thread dies [%ld]\n", gettid());
|
|
|
|
|
return NULL;
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
int main (int argc, char **argv)
|
|
|
|
|
{
|
|
|
|
|
pthread_t thread;
|
|
|
|
|
|
|
|
|
|
printf("main thread [%ld]\n", gettid());
|
|
|
|
|
|
|
|
|
|
pthread_create(&thread, NULL, run_deadline, NULL);
|
|
|
|
|
|
|
|
|
|
sleep(10);
|
|
|
|
|
|
|
|
|
|
done = 1;
|
|
|
|
|
pthread_join(thread, NULL);
|
|
|
|
|
|
|
|
|
|
printf("main dies [%ld]\n", gettid());
|
|
|
|
|
return 0;
|
|
|
|
|
}
|